Kalangagad Hydro Electric Project

Sector HydroPower
Developer Kalanga Hydro Limited
Address Sunkuda and Khiradadi VDC, Bajhang
Size/Capacity 15.33 MW
Total Project Cost NPR 4,355 Million
Project Status In Operation
NIFRA Role in Financing Lead Bank
Direct Employment Total 37
Male 34
Female 3

Kalanga Gad Hydroelectric Project (KGHEP) is located in Sunkuda and Khiratadi VDC’s of Bajhang district in Seti zones of Far Western Region of Nepal. It is a run-off-river project with a design flow of about 15.75 m3/s and topographical gross head of 123 m. With this arrangement, the project will generate the installed capacity of estimated 15.33MW.