| Sector | HydroPower |
| Developer | Sahas Urja Ltd. |
| Address | Tingla, Solududhkunda, Sindhupalchowk |
| Size/Capacity | 86MW |
| Total Project Cost | NPR 14,835.4 Million |
| Project Status | In Operation |
| NIFRA Role in Financing | Consortium Member Bank |
| Direct Employment Total | 23 |
| Male | 18 |
| Female | 5 |
Solu Khola (Dudhkoshi) Hydroelectric Project (SKDKHEP) is an 86 MW Run Of River (RoR) type of project located at Solududhkunda Municipality & Thulung Dudh Koshi Gaupalika of Solukhumbu District, Nepal. The project utilizes a design discharge of 17.05m³/s from Solu Khola and the elevation difference between the proposed intake at Solu Khola and powerhouse at Dudhkoshi River for power generation.