Pegu Khola Small Hydropower Project (PKSHP)

Sector HydroPower
Developer Bigu Hydro Venture Private Limited
Address Bigu Rural Municipality, Dolakha District, Bagmati Province, Nepal
Size/Capacity 3 MW
Total Project Cost 680 Million
Project Status Under Construction
NIFRA Role in Financing Sole

Pegu Khola Small Hydropower Project (PKSHP) is a run-of-river (RoR) type project located in Bigu Rural Municipality, Dolakha District, and Bagmati Province, Nepal. The project utilizes the design discharge of 1.95 m3/s at 40.58 percentile flow from Pegu Khola with gross head of 198.87 .