| Sector | HydroPower |
| Developer | Bigu Hydro Venture Private Limited |
| Address | Bigu Rural Municipality, Dolakha District, Bagmati Province, Nepal |
| Size/Capacity | 3 MW |
| Total Project Cost | 680 Million |
| Project Status | Under Construction |
| NIFRA Role in Financing | Sole |
Pegu Khola Small Hydropower Project (PKSHP) is a run-of-river (RoR) type project located in Bigu Rural Municipality, Dolakha District, and Bagmati Province, Nepal. The project utilizes the design discharge of 1.95 m3/s at 40.58 percentile flow from Pegu Khola with gross head of 198.87 .